    摘要:

    工程措施所形成的各类人工地貌具有地表完全裸露、人为因素影响大等特征。在人工模拟降雨的基础上 ,对铁路施工期形成的各类人为地貌和原地面的土壤侵蚀产沙、产流规律以及影响因素进行了研究。结果表明 ,降雨历时和累积径流量、累积产沙量以及含沙率的关系非常密切 ,同时植被覆盖度以及土壤质地是影响土壤侵蚀产流产沙的主要因素

    Abstract:

    Artificial physiognomy formed by engineering measures had characters of completely bare surface and being disturbed by human activity obviously. On the bases of simulated rainfall, the rule of soil erosion, sediment and runoff yield, and influence factors of artificial physiognomy formed in construction period of railway and natural ground,were researched. The results showed that rainfall duration had a close relation to accumulated runoff, accumulated sediment yield, rate of sediment yield; at the same time, vegetative coverage,density of soil, and pre moisture in soil are main factors affecting yield sediment and runoff.

    参考文献
    相似文献
    引证文献
引用本文

李忠武,蔡强国,吴淑安,唐政洪.内昆铁路施工期不同下垫面土壤侵蚀模拟研究[J].水土保持学报,2001,(2):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码